Usina BRAdvPL Guide
Sign in
← All topics
ENTRY POINTUnder review

F340VLD

User Function F340VLD()

Participates in payable-title compensation validation.

F340VLDFINA340
01 · OVERVIEW

Overview

The official overview describes validation of the title to be compensated. P12.2210 records lRet := ExecBlock in FA340TUDOK without a fourth argument. The assignment shows validation-result use, but the excerpt omits complete control flow, aliases and all return effects. The specific page was not recovered in full. (Refs. 1–2) Research includes indexed TDN evidence; no complete specific page was recovered.

02 · SYNTAX

Syntax

User Function F340VLD()

Parameters

Entry point context
UnconfirmedContext to confirm

The complete technical contract remains unconfirmed. Do not assume types, PARAMIXB positions or aliases beyond the evidence described.

Return value

Assigned to lRet; the complete acceptance, rejection and default policy has not been confirmed here.

03 · PRACTICAL EXAMPLE

Observed call and context

// P12.2210 caller excerpt (EURAI, ref. 2); not an entry point implementation.
// FINA340.PRX - FA340TUDOK() -> LRET := EXECBLOCK("F340VLD",.F.,.F.)
Expected result

The record shows arguments and immediate return use where present. It omits the full caller body and does not establish commit timing.

BEST PRACTICES
  • Do not publish Return .T. or Return Nil as a neutral baseline without checking the contract. Distinguish this call from grid confirmation in F340VALOK.
  • A call without a fourth argument does not document a PARAMIXB layout. Preserve caller identifiers and do not invent fields or positions.
  • Test plan: compare standard and customized flows, exercise success, rejection and repetition, and inspect balances, movements and accounting as applicable.
  • Under review: example not compiled or run in Protheus. Verify aliases, locks, transaction position and compatibility in the target release and patch.

Related content

REFERENCES
  1. TOTVS. Pontos de entrada disponíveis na FINA340. TDN. Accessed on 2026-10-24.
  2. EURAI. Pontos de Entrada P12.2210 - Parte 2. Universo do Desenvolvedor, 2023. Accessed on 2026-10-24.
Status
Under review
Page created on
Last reviewed on
Original language
Portuguese
Reviewed by
Usina.BR
0 approved comment(s)

Comments

There are no approved comments yet.

Sign in with Google or Microsoft to comment.

Powered by Usina Docs · Alpha